Investigation of Critical Equipment Failure at Nuclear Power Plant

A major European renewable energy company faced scru􀆟ny over their investigation methodology following a cri􀆟cal equipment failure at a nuclear power plant. The failure led to an unscheduled shutdown, prompting an investigation by the energy provider. This was challenged by the equipment manufacturer, who claimed that the methods and conclusions were flawed. CEERISK was engaged by the energy provider to independently evaluate the investigation process and provide insights into the manufacturer’s responsibilities when production defects are identified.